SIGN IN
Language
Log In / Register
Search now
 
 
(Forgot your password?)?

News 

 
600,000 tons of Angang Steel`s Fine Wire Production Successfully Finishes Heat Loading Test
Add to my favorite
2010-11-29

On Nov. 25, Angang Steel through 3 years of hardworking, its 600,000 tons of fine wire production have successfully passed the Heat Loading Test. The new production of wire constructs a strong base for the process of fine wire in China. It adopts temperature control rolling technology, which accomplishes the in-line strengthening treatment & hot-rolling, making it have the ability of developing in-line annealing-free technology, and provides the basis of industiral equipment to produce super-low carbon steel green products. 

Save and share