![](../../zh/supplier/images/base/arrow_up.png)
News
600,000 tons of Angang Steel`s Fine Wire Production Successfully Finishes Heat Loading Test
![](../../images/star_3.png)
Add to my favorite
2010-11-29
On Nov. 25, Angang Steel through 3 years of hardworking, its 600,000 tons of fine wire production have successfully passed the Heat Loading Test. The new production of wire constructs a strong base for the process of fine wire in China. It adopts temperature control rolling technology, which accomplishes the in-line strengthening treatment & hot-rolling, making it have the ability of developing in-line annealing-free technology, and provides the basis of industiral equipment to produce super-low carbon steel green products.
![](/images/ebook_arrow.png)
Subscribe
![](/images/ebook_bells.png)