SUBSCRIBE
SIGN IN
(Forgot your password?)?
News 

Union Pacific Completes Railroad Spike Fastening System Replacement in the Columbia River Gorge

a4961_0.png
Add to my favorite
2016-10-24

Union Pacific completed its rail fastening system replacement work throughout the eight miles of curved track in the Columbia River Gorge. The track throughout the curves is secured with a fastening system that includes spikes instead of lag bolts, enhancing defect detectability during inspections.

"We have a clear focus – to safely operate our trains and protect our communities," said Wes Lujan, Union Pacific vice president – Public Affairs, Western Region. "The fastening system replacement reinforces our commitment to rail safety in the Gorge as we strive to improve upon our 99.98 percent hazardous materials safety record and achieve our goal of zero incidents."

The company has made considerable safety improvements, reducing reportable derailments across the network by 35 percent from 2000 to 2015. In Oregon specifically, Union Pacific reduced reportable derailments by 58 percent from 2000 to 2015.

扣件
國際展會
惠達雜誌
匯達實業
外銷媒合
廣告刊登
螺絲五金
五金工具
紧固件
台灣扣件展
印度新德里螺絲展
越南河內螺絲展
墨西哥瓜達拉哈拉螺絲展
美國拉斯維加斯螺絲暨機械設備展
波蘭克拉科夫螺絲展
義大利米蘭螺絲展
德國司徒加特螺絲展
FAIR INDIA
FASTENER FAIR VIETNAM
FASTENER FAIR MEXICO
FASTENER POLAND
FASTENER FAIR ITALY
FASTENER FAIR GLOBAL
FASTENER WORLD
Save and share
 
 
READ NEXT

Subscribe